Stereoscopic library The construction period is affected by many factors.
Starting from the planning and design stage, this process may take about 2-4 weeks. Warehouse layout design shall be carried out according to the type, quantity, warehousing frequency and other factors of stored goods. For example, for the stereoscopic warehouse where small electronic products are stored and frequently warehoused, a compact rack conveying system layout needs to be designed; If it is a three-dimensional warehouse of large mechanical parts, it is necessary to consider the load bearing and larger operating space of the shelves.
For infrastructure, if the site does not need complex land reconstruction, such as building in the existing standard factory buildings, the infrastructure construction may take 4-8 weeks. This includes the reinforcement and leveling of the ground to ensure that it can bear the weight of the three-dimensional warehouse shelves and goods. If it is necessary to build new buildings to place stereoscopic warehouses, the time will be greatly extended, which may last for several months or even more than a year.

The equipment installation phase is generally 6-10 weeks. This includes installation of shelves, commissioning of automatic equipment such as stacker, etc. For example, to install a highly automated roadway stacker system, to ensure that the stacker runs accurately on the track and can store and pick up goods accurately, professionals need to carefully install and repeatedly debug.
The system integration and testing phase takes about 3-6 weeks. The warehouse management system (WMS) and the equipment control system need to be integrated to ensure that the information transmission is correct, and at the same time, the whole process of goods warehousing, storage, ex warehouse, etc. needs to be tested.
In general, the construction period of a medium-sized stereoscopic warehouse may be about 3-6 months, but if the scale is large, the requirements are high, or unforeseen circumstances such as equipment supply delay, complex building structure problems, the construction period may be extended to one year or more.