Stereoscopic library

Intelligent logistics system integrator&manufacturer

19 years of experience in independent R&D, manufacturing and delivery of digital intelligent warehousing logistics

400-090-1058

thirteen billion nine hundred and twenty-two million five hundred and twenty-four thousand four hundred and thirty-two

 RGv

contact us

Guangdong Shunli Intelligent Logistics Equipment Co., Ltd

Contact: Mr. Du/Miss Xiao

Tel.: 0769-88708222/85491680

Mobile: 136 0028 2227

Email: [email protected]

Fax: 0769-85492858

Address: Tangxia Village Industrial Zone, Gaobu Town, Dongguan City

How to effectively maintain the equipment of the automated stereo library?

Your current location: home page >> News Center >> technical knowledge

How to effectively maintain the equipment of the automated stereo library?

Date of issue: 2024-11-14 Author: Click:

Automatic stereo library Effective maintenance of equipment is the key to ensure its operation. The following are specific maintenance measures:

1、 Daily patrol inspection

Daily patrol inspection is the basis of equipment maintenance. Every day, the staff should Stereoscopic library Check the equipment, including stacker, conveyor, shelf, etc. For the stacker, check whether there is any foreign matter on its traveling track, and whether the chain or wire rope is loose; Check whether the conveyor belt is damaged and whether the drum rotates normally; The rack shall be checked whether the beam and column are deformed and whether the connectors are firm. Through simple visual and manual inspection, we can find some small problems in time, such as loose screws, slight wear of parts, etc., and tighten and repair them in time to avoid problems from expanding.

 Automatic stereo library

2、 Regular maintenance

Maintenance of mechanical parts

The mechanical parts of the stacker and conveyor shall be maintained at specified intervals (e.g. every 3-6 months). For transmission parts, such as motor and reducer, check the oil quality and quantity of lubricating oil, and supplement or replace them in time. At the same time, clean the dust and sundries on the surface of the equipment to prevent them from entering the interior of the machine and affecting the performance of the equipment.

For the shelf, its bearing capacity should be checked regularly. Especially after a period of use, local deformation may occur. The key parts of the shelf can be detected by professional detection tools, and the deformed parts can be corrected or replaced in time.

Electrical system maintenance

Regularly (every 3 months or so) check whether the line connections in the electrical control cabinet are loose and whether the relays and contactors work normally. At the same time, dust on electrical equipment shall be cleaned to prevent static electricity and short circuit.

Calibrate and clean the sensor to ensure that it can accurately detect the position, status and other information of goods. For example, if the lens of the photoelectric sensor is covered with dust, it may cause signal transmission errors and affect the normal operation of the equipment.

3、 Troubleshooting

In case of equipment failure, timely maintenance shall be carried out. First, the maintenance personnel should quickly locate the fault point according to the equipment fault prompt (such as alarm code). For some common faults, such as motor overload, conveyor belt deviation, etc., maintenance personnel should be able to quickly take effective solutions. For more complex faults, such as control system faults, it is necessary to contact the professional technicians of the equipment supplier for maintenance. At the same time, it is necessary to make fault records and analyze the causes of the faults in order to take preventive measures to prevent similar faults from happening again.


Related labels: Automatic stereo library

Z Close:

 1680766817842820.png   sp.png   wx.png


twenty-four

Hourly service hotline

400-090-1058

 1680767017108827.png

 y1.png

National free service hotline:

400-090-1058 

 y2.png

Email:

[email protected]

 y3.png

Address:

Tangxia Village Industrial Zone, Gaobu Town, Dongguan City, Guangdong Province, China

No. 138, Gaolong West Road, Gaobu Town, Dongguan City, Guangdong Province, China (Shunli Intelligent R&D Center)

Copyright © //jyrjy.cn/ Shunli Cubic Warehouse specializes in Stereoscopic library , Automatic stereo library , Intelligent stereo library Welcome to inquire! Technical support:
Links: