Stereoscopic library

Intelligent logistics system integrator&manufacturer

19 years of experience in independent R&D, manufacturing and delivery of digital intelligent warehousing logistics

400-090-1058

thirteen billion nine hundred and twenty-two million five hundred and twenty-four thousand four hundred and thirty-two

 RGv

contact us

Guangdong Shunli Intelligent Logistics Equipment Co., Ltd

Contact: Mr. Du/Miss Xiao

Tel.: 0769-88708222/85491680

Mobile: 136 0028 2227

Email: [email protected]

Fax: 0769-85492858

Address: Tangxia Village Industrial Zone, Gaobu Town, Dongguan City

How to calculate the construction cost of stereoscopic warehouse

Your current location: home page >> News Center >> Industry News

How to calculate the construction cost of stereoscopic warehouse

Date of issue: 2024-04-15 Author: Click:

   Stereoscopic library The construction cost of is generally considered and calculated by multiple factors, including but not limited to the following aspects:

Land cost: The three-dimensional warehouse needs a certain scale of land for construction, and the location, area, land nature (whether leveling or reconstruction is required) and other factors will affect the land cost.

Building structure cost: The building structure of the three-dimensional warehouse includes the main structure, columns, beams, floors, etc. Its material selection, structural design complexity, and quantities will directly affect the building structure cost.

Cost of equipment and facilities: The stereoscopic warehouse needs to be equipped with shelves, conveying equipment, stacking robots, cargo tracking systems and other equipment and facilities, and their types, specifications and quantities will affect the cost of equipment and facilities.

Labor costs: including wages and benefits of construction personnel, technicians, managers, etc., as well as possible training and safety training costs.

 Stereoscopic library

Design and planning costs: The design and planning of the stereo warehouse needs a professional engineering design team, and the design costs are usually related to the size and complexity of the project.

Environmental protection and safety costs: environmental assessment, construction of environmental protection facilities and investment in safety facilities may be required for the construction of the three-dimensional warehouse to ensure that the operation of the three-dimensional warehouse after completion complies with relevant regulations and standards.

Investment in the early stage of operation: including market research, operation mode design, personnel training, system testing and other investment costs in the early stage of the project.

Other expenses: such as taxes, insurance premium, loan interest, etc.

Therefore, the cost calculation of the construction of three-dimensional warehouse needs to comprehensively consider the above aspects, and carry out detailed calculation and evaluation according to the specific project situation. In actual projects, professional construction cost engineers or project management teams are usually responsible for cost estimation and control to ensure the feasibility and economy of the project.


Related labels: Stereoscopic library

Z Close:

 1680766817842820.png   sp.png   wx.png


twenty-four

Hourly service hotline

400-090-1058

 1680767017108827.png

 y1.png

National free service hotline:

400-090-1058 

 y2.png

Email:

[email protected]

 y3.png

Address:

Tangxia Village Industrial Zone, Gaobu Town, Dongguan City, Guangdong Province, China

No. 138, Gaolong West Road, Gaobu Town, Dongguan City, Guangdong Province, China (Shunli Intelligent R&D Center)

Copyright © //jyrjy.cn/ Shunli Cubic Warehouse specializes in Stereoscopic library , Automatic stereo library , Intelligent stereo library Welcome to inquire! Technical support:
Links: