Stereoscopic library

Intelligent logistics system integrator&manufacturer

19 years of experience in independent R&D, manufacturing and delivery of digital intelligent warehousing logistics

400-090-1058

thirteen billion nine hundred and twenty-two million five hundred and twenty-four thousand four hundred and thirty-two

 RGv

contact us

Guangdong Shunli Intelligent Logistics Equipment Co., Ltd

Contact: Mr. Du/Miss Xiao

Tel.: 0769-88708222/85491680

Mobile: 136 0028 2227

Email: [email protected]

Fax: 0769-85492858

Address: Tangxia Village Industrial Zone, Gaobu Town, Dongguan City

Operation process of automated storage rack

Your current location: home page >> News Center >> Industry News

Operation process of automated storage rack

Date of issue: 2018-01-18 Author: Click:

   Automatic stereoscopic warehouse shelf Operation process of

   Automatic stereo library The basic operation process of the shelf is mainly divided into three steps:

(1) When the cargo unit enters the warehouse, it is transported to the warehouse by the conveying system. The cargo is scanned and read by the barcode identification system. The information carried by the barcode label is read by the reader and transmitted to the central server. The control system judges whether the warehouse and the cargo location coordinates are based on the information returned by the central server, When it is possible to determine the warehousing, send the warehousing instruction containing the location coordinates to the execution system, and the stacker will store the goods to the designated cargo cell through automatic addressing. After completing the man warehouse operation, the stacker returns the job completion information to the control system and waits for receiving the next job order. At the same time, the control system returns the job completion information to the central server database for database management.

 Stereoscopic library

(2) After receiving the goods demand information from production or customers, the warehouse out operation process administrator will input the goods information into the warehouse out list of the upper management computer as required, and the central server will automatically query the inventory, generate the warehouse out operation according to the principles of first in first out, uniform warehouse out, and nearby warehouse out, and transmit it to the terminal control system, The control system arranges the operation sequence of the stacker according to the current outbound operation and the state of the stacker, and sends the arranged operation commands to the corresponding stacker one by one. The stacker will take out the goods to the designated storage location and place them on the tunnel exit platform, and return the operation completion information to the control system, waiting for the next operation. The monitoring system feeds back the completion information of the goods delivery to the central server system, and the management system updates the goods information and storage space occupancy in the inventory database to complete the delivery management. If all the goods in a location have been issued, the goods record will be cleared from the location occupancy table and the location occupancy mark will be cleared.

(3) In the picking operation process, when the goods are picked out from the goods unit, the stacker will take out the goods to the designated address and place them on the tunnel outbound platform. After picking up the goods, the automatic guided vehicle will send the goods to the sorting platform, where the staff or automatic sorting equipment will sort according to the outbound list. After sorting, the goods will be sent back to the entrance of the tunnel by the automatic guided vehicle, and the goods will be delivered to the warehouse or directly out of the warehouse by the stacker


Related labels: Stereoscopic library , Automatic stereo library , Automatic stereo warehouse manufacturer

Z Close:

 1680766817842820.png   sp.png   wx.png


twenty-four

Hourly service hotline

400-090-1058

 1680767017108827.png

 y1.png

National free service hotline:

400-090-1058 

 y2.png

Email:

[email protected]

 y3.png

Address:

Tangxia Village Industrial Zone, Gaobu Town, Dongguan City, Guangdong Province, China

No. 138, Gaolong West Road, Gaobu Town, Dongguan City, Guangdong Province, China (Shunli Intelligent R&D Center)

Copyright © //jyrjy.cn/ Shunli Cubic Warehouse specializes in Stereoscopic library , Automatic stereo library , Intelligent stereo library Welcome to inquire! Technical support:
Links: