Stereoscopic library

Intelligent logistics system integrator&manufacturer

19 years of experience in independent R&D, manufacturing and delivery of digital intelligent warehousing logistics

400-090-1058

thirteen billion nine hundred and twenty-two million five hundred and twenty-four thousand four hundred and thirty-two

 RGv

contact us

Guangdong Shunli Intelligent Logistics Equipment Co., Ltd

Contact: Mr. Du/Miss Xiao

Tel.: 0769-88708222/85491680

Mobile: 136 0028 2227

Email: [email protected]

Fax: 0769-85492858

Address: Tangxia Village Industrial Zone, Gaobu Town, Dongguan City

What kind of work do you need to prepare to install the shelves of the stereo library?

Your current location: home page >> News Center >> Industry News

What kind of work do you need to prepare to install the shelves of the stereo library?

Date of issue: 2023-07-24 Author: Click:

What kind of work do you need to prepare for installation Stereoscopic library Library shelves?

In automated warehouses and retrieval systems, shelf installation is very important. Errors in the installation process not only affect the delivery of shelves, but also may cause installation risks in serious cases. Before the installation of the shelf, prepare the shelf environment for installation, fully adapt to the shelf environment, and ensure the long-term safe use of the shelf. The shelf installation preparation is divided into three stages: stereoscopic warehouse maintenance 1, construction conditions (1) construction before installation, installation personnel training, clear safety responsibilities, familiar with installation drawings; Special or complex installation shall be arranged according to the construction schedule. (2) Before installation, it is necessary to understand the basic situation of the installation site, especially the layout of traffic roads and power lines. (3) Before installation, the roof and internal plaster works on the site shall be roughly completed, and the relevant subbase and trenches shall also be completed. The concrete strength shall not be less than 75% of the design strength. The rubble and garbage in and around the installation site shall also be removed. (4) If the building structure is used as the starting point or other equipment is needed, the consent of the owner shall be obtained. (5) When working in the Owner's factory, the installation personnel shall abide by the code of conduct for employees of the Owner's enterprise. (6) The number of tools prepared before construction depends on the project scale.

Before opening the package or box, check and store (1), check the "shipping list" and "standard parts packing list", and make records. If the package is loose, missing parts, seriously damaged, timely response, loose package, seriously damaged, and seriously damaged surface, on-site photography and image data of the parts shall be timely submitted to the supplier. (2) When opening the package, check the part drawings, check against specifications, dimensions, tolerance types and other indicators, and timely find error reports. (3) The shelf shall be stored in a cool and dry place, avoiding direct sunlight and rain. When using the forklift, the moving parts in the crane and other equipment should be handled carefully to avoid damage to the parts. (4) Parts, machinery, equipment and tools shall be in good condition and shall not be deformed, damaged, disordered or lost. Figure 3. The treatment of foundation and embedded plate, layout of embedded parts, geometric dimensions and quality requirements (including embedded plates of track, column and rack) shall meet the requirements of the drawings. The layout or installation of embedded parts (embedded parts) shall be reviewed. After the first pouring in the whole shelf area, the thickness of the reinforced concrete slab (including the embedded slab) shall not be less than 80mm, the levelness of the embedded parts shall be ± 10mm, the embedded parts shall be welded with steel bars, and the height deviation of the upper surface of each embedded plate shall not be greater than ± 1mm.

 Stereoscopic library

Related labels: Stereoscopic library , , Automatic stereo library , Composition of automated stereo library

Z Close:

 1680766817842820.png   sp.png   wx.png


twenty-four

Hourly service hotline

400-090-1058

 1680767017108827.png

 y1.png

National free service hotline:

400-090-1058 

 y2.png

Email:

[email protected]

 y3.png

Address:

Tangxia Village Industrial Zone, Gaobu Town, Dongguan City, Guangdong Province, China

No. 138, Gaolong West Road, Gaobu Town, Dongguan City, Guangdong Province, China (Shunli Intelligent R&D Center)

Copyright © //jyrjy.cn/ Shunli Cubic Warehouse specializes in Stereoscopic library , Automatic stereo library , Intelligent stereo library Welcome to inquire! Technical support:
Links: